Settlement observation and prediction research of test embankment in collapsible loess area along Zhengzhou-Xi'an passenger dedicated line

WANG Xiao-jun 1, 2, QU Yao-hui2, WEI Yong-liang2, YANG Yin-hai2, DA Yi-zheng2   

  1. 1. Ningbo Institute of Technology, Zhejiang University, Ningbo, Zhejiang 315100, China; 2. Northwest Research Institute Co., Ltd., of China Railway Engineering Corporation, Lanzhou 730000, China
  • Received:2010-04-13 Online:2010-08-10 Published:2010-09-09

Abstract:

The Zhengzhou-Xi'an passenger dedicated line allows 15 mm settlement of embankment after acceptance. The settlement control of ground treatment in collapsible loess is a key technical problem. Therefore, the settlement of an embankment construction on ground treatment with different measures is observed and researched experimentally in a selected area of typical collapsible loess. The results show that the compression settlement of embankment body is only 3 mm and have already stabilized in 15 days after completion of embankment. The embankment settlement is primarily controlled by the foundation settlement which is determined by the settlement of soils below three different kinds of ground treatment layer. A section of pile thrusted-expanded in column-hammer which treats all 22 m depth of collapsible loess is best, a section of cement soil pile which treats 15 m depth of collapsible loess is better, a section of dynamic compaction which treats 6 m depth of collapsible loess is worst in the settlement, ground treatment and immersion effect. It is very essential that the reasonable waterproof and drainage measures are taken to prevent water from immersing the vicinity of slope foot. The average value of results which are predicted by the hyperbolic method, three-point method and Asaoka method is used as the final settlement of embankment. The constant preloading can be removed to lay ballastless track after 5 months in the section of pile thrusted-expanded in column-hammer and after 8 months in the section of cement soil pile. But it may need to continue for a long time in the section of dynamic compaction.

Key words: passenger dedicated line, collapsible loess, ground treatment, embankment, settlement

CLC Number: 

  • U 238
[1] HE Zhi-jun, LEI Hao-cheng, XIA Zhang-qi, ZHAO Lian-heng. Analysis of settlement and internal force displacement of single pile in multilayer soft soil foundation [J]. Rock and Soil Mechanics, 2020, 41(2): 655-666.
[2] LIU Cheng-yu, CHEN Bo-wen, LUO Hong-lin, RUAN Jia-chun, . Experimental study of seepage erosion induced by pipeline damage under full pipe flow condition [J]. Rock and Soil Mechanics, 2020, 41(1): 1-10.
[3] LIU Zhong-yu, XIA Yang-yang, ZHANG Jia-chao, ZHU Xin-mu. One-dimensional elastic visco-plastic consolidation analysis of saturated clay considering Hansbo’s flow [J]. Rock and Soil Mechanics, 2020, 41(1): 11-22.
[4] WANG Qing-zhi, FANG Jian-hong, CHAO Gang. Analysis of cooling effect of block-stone expressway embankment in warm temperature permafrost region [J]. Rock and Soil Mechanics, 2020, 41(1): 305-314.
[5] ZHANG Zhi-guo, LI Sheng-nan, ZHANG Cheng-ping, WANG Zhi-wei, . Analysis of stratum deformation and lining response induced by shield construction considering influences of underground water level rise and fall [J]. Rock and Soil Mechanics, 2019, 40(S1): 281-296.
[6] LU Liang, SHI Tong-hui, YANG Dong, . Control effect of uneven settlement of subgrade by composited method of replacement load shedding and reinforced embankment [J]. Rock and Soil Mechanics, 2019, 40(9): 3474-3482.
[7] ZHANG Zhi-guo, HUANG Mao-song, YANG Xuan, . Analytical solution for dissipation of excess pore water pressure and soil consolidation settlement induced by tunneling under the influence of long-term leakage [J]. Rock and Soil Mechanics, 2019, 40(8): 3135-3144.
[8] ZHU Yan-peng, DU Xiao-qi, YANG Xiao-hui, LI Hui-jun, . Research on utility tunnel foundation treated by compaction piles and post-work immersion test in self-weight collapsible loess area with large thickness [J]. Rock and Soil Mechanics, 2019, 40(8): 2914-2924.
[9] DU Wen, WANG Yong-hong, LI Li, ZHU Lian-chen, ZHU Hao-tian, WANG You-qi, . Case study on double-deck subway station undercrossing and analysis of filed monitoring about this case [J]. Rock and Soil Mechanics, 2019, 40(7): 2765-2773.
[10] WANG Hong-lei, SUN Zhi-zhong, LIU Yong-zhi, WU Gui-long, . The monitoring analysis of the thermal-mechanical response on embankment with thawed interlayer along Qinghai-Tibet Railway [J]. Rock and Soil Mechanics, 2019, 40(7): 2815-2824.
[11] HUANG Da-wei, ZHOU Shun-hua, FENG Qing-song, LUO Kun, LEI Xiao-yan, XU You-jun, . Analysis for vertical earth pressure transference on overlaying soils of shield tunnel under uniform surface surcharge [J]. Rock and Soil Mechanics, 2019, 40(6): 2213-2220.
[12] ZHANG Zhi-guo, ZHANG Rui, HUANG Mao-song, GONG Jian-fei, . Optimization analysis of pile group foundation based on differential settlement control and axial stiffness under vertical loads [J]. Rock and Soil Mechanics, 2019, 40(6): 2354-2368.
[13] FU Hong-yuan, LIU Jie, ZENG Ling, BIAN Han-bing, SHI Zhen-ning, . Deformation and strength tests of pre-disintegrating carbonaceous mudstone under loading and soaking condition [J]. Rock and Soil Mechanics, 2019, 40(4): 1273-1280.
[14] LIU Nian-wu, CHEN Yi-tian, GONG Xiao-nan, YU Ji-tao, . Analysis of deformation characteristics of foundation pit of metro station and adjacent buildings induced by deep excavation in soft soil [J]. Rock and Soil Mechanics, 2019, 40(4): 1515-1525.
[15] LIU Cheng-yu, ZHANG Xiang, CHENG Kai, CHEN Bo-wen, . Experimental study of settlement caused by water and sand inrush in underground engineering [J]. Rock and Soil Mechanics, 2019, 40(3): 843-851.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
[1] LIN Hang,CAO Ping,LI Jiang-teng,JIANG Xue-liang,HE Zhong-ming. Deformation stability of three-dimensional slope based on Hoek-Brown criterion[J]. , 2010, 31(11): 3656 -3660 .
[2] LI Jun-cai,JI Guang-qiang,SONG Gui-hua,ZHANG Qiong,WANG Zhi-liang,YAN Xiao-min. In-situ measurement and analysis of sparse pile-raft foundation of high-rise building[J]. , 2009, 30(4): 1018 -1022 .
[3] WEI Ning,LI Xiao-chun,WANG Yan,GU Zhi-meng. Resources quantity and utilization prospect of methane in municipal solid waste landfills[J]. , 2009, 30(6): 1687 -1692 .
[4] NIU Wen-jie,YE Wei-min,LIU Shao-gang,YU Hai-tao. Limit analysis of a soil slope considering saturated-unsaturated seepage[J]. , 2009, 30(8): 2477 -2482 .
[5] YIN Hong-lei,XU Qian-jun,LI Zhong-kui. Effect of swelling deformation on stability of expansive soil slope[J]. , 2009, 30(8): 2506 -2510 .
[6] WANG Ke-liang, LIU Ling, SUI Tong-bo , XU Yun-hai, HU Ting-zheng. Experiment research on anti-shear(cut)performance of dam bedrock-rubber powder modified concrete in-situ[J]. , 2011, 32(3): 753 -756 .
[7] LIN Da-ming1,2,SHANG Yan-jun1,SUN Fu-jun3,SUN Yuan-chun1,2,WU Feng-bo1,2,LIU Zhi. Study of strength assessment of rock mass and application[J]. , 2011, 32(3): 837 -842 .
[8] WU Jian,FENG Shao-kong,LI Hong-jie. Study of automatically extracting structural plane parameters from borehole images[J]. , 2011, 32(3): 951 -957 .
[9] LI Tao ,ZHANG Zhi-hong ,TANG Bao-rong. Experimental study of retardant effect of clay barriers on contaminants in a confined disposal facility for dredged sediments from Taihu Lake[J]. , 2012, 33(4): 993 -998 .
[10] LI Jian-jun,SHAO Sheng-jun,YANG Fu-yin,YANG Chun-ming. Experimental research on impermeable characteristics of slurry cake in cutoff wall hole of coarse-grained soil[J]. , 2012, 33(4): 1087 -1093 .