The control technology of air shaft cross passage construction in Xi’an subway with "tunnel first then well" method

ZHU Cai-hui1, 2, LAN Kai-jiang1, 2, DUAN Yu1, 2, HE Hong3   

  1. 1. State Key Laboratory of Eco-hydraulics in Northwest Arid Region, Xi'an University of Technology, Xi'an, Shaanxi 710048, China; 2. Institute of Geotechnical Engineering, Xi'an University of Technology, Xi'an, Shaanxi, 710048, P.R. China 3. China Railway City Development and Investment Group Co., Ltd., Xi'an, Shaanxi 710013, China)
  • Received:2019-08-19 Revised:2019-12-03 Online:2020-06-19 Published:2020-06-09
  • Supported by:
    This work was supported by the Research Fund of the State Key Laboratory of Eco-hydraulics in Northwest Arid Region, Xi’an University of Technology(2019KJCXTD-12), the National Natural Science Foundation of China(NSFC(51678484), and the China Scholarship Council(201808610061).

Abstract: The subway construction in sandy cobble and loess layers in Xi'an is selected as the background. Applying numerical methods, in-situ monitoring and other means,, in view of the excavation methods during the construction of cross passage by tunneling and back well method, the pre-reinforcement schemes of existing shield pipe segment is proposed, optimized analyzed and evaluated. The results show that the increase of excavation layers will result in the surface settlement and the shortage of construction work space. It is suggested to use the 4 steps, and the core soil method is reserved for excavation. The length of the upper and lower steps should not exceed 3 m. The grouting thickness of the gravel and loess stratum from outside of the cross passage is at least 2.0 m, and the elastic modulus of the stratum should be increased by more than 0.2 times after the reinforcement. The advanced support methods of small and large pipe sheds can be used to enhance the excavation stability of the stratum and the safety of the shield tunnel segments. Before the existing pipe shield segment is broken, the connecting bolts of 4 to 6 ring segments on both sides of the transverse channel should be loosened to reduce the effect of longitudinal compression stress concentration of the shield segment caused by the excavation of the transverse channel. When the horizontal cross passage passes through the existing shield segment, the static breaking method should be adopted to remove the segment vertically from top to bottom. Then the concrete pouring and reinforcement implantation should be carried out at the interface between the air shaft cross passage and the shield segment. The WSS grouting should be used to reinforce the soil stratum and implement the anti-seepage treatment at the joint.

Key words: tunnel first then well method, Xi’an subway, shield lining segments, construction technology, mechanical response

CLC Number: 

  • TU452
[1] JIANG Zhong-ming, LI Peng, ZHAO Hai-bin, FENG Shu-rong, TANG Dong, . Experimental study on performance of shallow rock cavern for compressed air energy storage [J]. Rock and Soil Mechanics, 2020, 41(1): 235-241.
[2] WENG Yong-hong, ZHANG Lian, XU Tang-jin, HUANG Shu-ling, DING Xiu-li, . Safety evaluation on interaction of new plug structure and surrounding rock mass under high water head [J]. Rock and Soil Mechanics, 2020, 41(1): 242-252.
[3] WU Qiu-hong, ZHAO Fu-jun, WANG Shi-ming, ZHOU Zhi-hua, WANG Bin, LI Yu, . Mechanical response characteristics of full grouted rock bolts subjected to dynamic loading [J]. Rock and Soil Mechanics, 2019, 40(3): 942-950.
[4] ZONG Zhong-ling, LU Xian-long, LI Qin-song,. Comparison test of compression and uplift on pressure-static and grouting micropiles [J]. , 2018, 39(S1): 362-368.
[5] ZHANG Chuan-qing, GAO Yang, LIU Ning, ZHOU Hui, FENG Xia-ting, . Reflection on the problems in mechanical response monitoring and testing design of deep tunnels [J]. , 2018, 39(7): 2626-2631.
[6] XIE Tao, LUO Qiang, ZHOU Cheng, ZHANG Liang, JIANG Liang-wei, . Mechanical response of shoulder sheet-pile wall under strictly restricted deformation condition in steep ground along a high-speed railway [J]. , 2018, 39(1): 45-52.
[7] DENG Peng ,GUO Lin ,CAI Yuan-qiang ,WANG Jun,. Research on mechanical response of soft clay under cyclic loading involving principal stress rotation [J]. , 2015, 36(S2): 148-156.
[8] SUN Li-Qiang , ZHANG Jing-Jing , LI Heng , YAN Shu-wang , HUO Zhi-liang , . Research on key factors influencing relative angle of prestressed concrete cylinder pipe in soft soil foundation [J]. , 2015, 36(S1): 293-298.
[9] LIN Wei-di,LI Zhang-ming,LUO Zhi-bin. Mechanical responses of muck under triaxial impact loading [J]. , 2015, 36(7): 1966-1972.
[10] LI Jun-ping,WANG Hong-xing,WANG Xiao-guang,CHENG Xian-gen. Research progress in pressure-relief mining [J]. , 2014, 35(S2): 350-358.
[11] LIU Xian-shan , CHEN Zhi . Influence of fluid viscosity on mechanical response of sandstone around oil wellbore [J]. , 2013, 34(10): 2984-2990.
[12] WU Yue-dong , WANG Wei-chun , LIU Jian , JI Kai . Test research on compaction effect of expressway embankment with sand-gravel-cobble mixture [J]. , 2012, 33(S1): 211-216.
[13] ZHAO Lian-heng,LUO Heng,LI Liang,DAN Han-cheng,ZOU Jin-feng. Experimental research on implementing method of backfill of abutment back with horizontal flexible-reinforced grouting technology [J]. , 2010, 31(1): 199-205.
[14] LI Liang, ZHAO Lian-heng, ZOU Jin-feng, DAN Han-cheng, LIU Xiang. Experimental research on horizontal flexible reinforced grouting with physical model [J]. , 2009, 30(7): 2081-2086.
[15] GU Qiang-kang, LI Ning, HUANG Wen-guang. Research on differential settlement index of high-filled subgrade after construction in mountainous airport [J]. , 2009, 30(12): 3865-3870.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
No Suggested Reading articles found!